Change orders: get every change in writing first
"Sure, we can do that" isn't a price.
Any change after you sign the contract needs a written change order before the work starts: what changes, the price (or credit), the schedule impact in days, the new contract total, and both signatures with a date. Keep upgrades out of your contingency (that's for surprises behind the walls) and track one running total.


Put this to work.
Start with the free download, or get the full product.
Download freeSee the full productKeep reading
Kitchen remodel timeline: plan first, then about 12 weeks on siteRenovation · 2026-11-01Keep renovation receipts: improvements can lower the tax when you sellRenovation · 2026-11-01Bath fan size: 1 CFM per sq ft, 50 CFM minimum, vented outsideRenovation · 2026-11-01Ceiling heights: 7 ft rooms, 6′8″ baths, 5 ft on slopesBathroom · 2026-11-01Seating group: keep seats within 8 ft and float them off the wallLiving room · 2026-11-01IFC in Revit: link to coordinate, open to take overCAD craft · 2026-11-01