Contractor payments: never pay ahead of the work
Never pay ahead of the work.
Your money should follow real progress. Keep the deposit small: California caps home-improvement down payments at $1,000 or 10% of the contract, whichever is less (check your state). Tie every other payment to a finished milestone you can see, like the rough-in inspection passed or cabinets set, and write the schedule into the contract. Ask for a lien release with each payment, and hold the final payment until the final inspection passes and the punch list is done.


Put this to work.
Start with the free download, or get the full product.
Download freeSee the full productKeep reading
Kitchen remodel timeline: plan first, then about 12 weeks on siteRenovation · 2026-11-01Keep renovation receipts: improvements can lower the tax when you sellRenovation · 2026-11-01Bath fan size: 1 CFM per sq ft, 50 CFM minimum, vented outsideRenovation · 2026-11-01Ceiling heights: 7 ft rooms, 6′8″ baths, 5 ft on slopesBathroom · 2026-11-01Seating group: keep seats within 8 ft and float them off the wallLiving room · 2026-11-01IFC in Revit: link to coordinate, open to take overCAD craft · 2026-11-01