Guides / Renovation · Published 2026-10-28
Hold the final payment until the punch list is done
Never make the last payment before the punch list.
The final payment is your leverage. Keep one (often around 10%) due only at completion, and write down what complete means: final inspection passed and every punch-list item fixed. Walk the house in daylight, run every tap, switch and appliance, and collect warranties, manuals and paint codes before you pay. Where your state uses them, ask for lien waivers too.


Put this to work.
Start with the free download, or get the full product.
Download freeSee the full productKeep reading
Kitchen remodel timeline: plan first, then about 12 weeks on siteRenovation · 2026-11-01Keep renovation receipts: improvements can lower the tax when you sellRenovation · 2026-11-01Bath fan size: 1 CFM per sq ft, 50 CFM minimum, vented outsideRenovation · 2026-11-01Ceiling heights: 7 ft rooms, 6′8″ baths, 5 ft on slopesBathroom · 2026-11-01Seating group: keep seats within 8 ft and float them off the wallLiving room · 2026-11-01IFC in Revit: link to coordinate, open to take overCAD craft · 2026-11-01