Make every selection before demo day
Pick every finish before the first wall comes down.
Undecided selections stall more renovations than bad weather. Order the long-lead items (cabinets, special-order windows) before demo, choose countertops early (they're templated after the cabinets go in), order tile with 10% extra, and buy the shower valve and trim from the same brand before rough-in. Get appliance spec sheets so the cabinet sizes are right, and mark where light fixtures go.


Put this to work.
Start with the free download, or get the full product.
Download freeSee the full productKeep reading
Kitchen remodel timeline: plan first, then about 12 weeks on siteRenovation · 2026-11-01Keep renovation receipts: improvements can lower the tax when you sellRenovation · 2026-11-01Bath fan size: 1 CFM per sq ft, 50 CFM minimum, vented outsideRenovation · 2026-11-01Ceiling heights: 7 ft rooms, 6′8″ baths, 5 ft on slopesBathroom · 2026-11-01Seating group: keep seats within 8 ft and float them off the wallLiving room · 2026-11-01IFC in Revit: link to coordinate, open to take overCAD craft · 2026-11-01